100 MWac PV Plant in Tunisia
Case Studies
Information
Suntrace was responsible for the optimisation of plant layout parameters including, pitch and DC/AC ratio for a single axis tracked system considering mono-crystalline module technology, central inverter systems, and a 1500V state of the art system. Moreover, the modelling of each design configuration in PVSyst software including 3D shading scene and consideration of far shadings were our tasks. Suntrace estimated the costs (CAPEX and OPEX) for the plant configuration and calculated the financial Key Performance Indicators (KPI) through in-house Cash-Flow based Financial Modelling.
Services:
• Solar Resource Assessment
• Techno-Economic-Optimisation
• EPC Bid Evaluation
• Energy Yield Assessment Reports