Stand Alone Grid: Bordesholm

Stand Alone Grid: Bordesholm

Projects we're involved in
Stand Alone Grid: Bordesholm
Stand Alone Grid: Bordesholm
Stand Alone Grid: Bordesholm

Information

With the SMA Energy System Large Scale, the public utility company Versorgungsbetriebe Bordesholm is able to supply the European utility grid with balancing energy - a lucrative business model. At the same time, it also allows the electric utility company to guarantee a completely secure electricity supply for the region. In the event of a utility grid failure, the SMA system technology will automatically switch to stand-alone mode. And it supplies 100 percent of its electricity from renewable energy. Find out more from the video and case study below: https://www.youtube.com/watch?v=y9wp53WfROM https://www.sma-australia.com.au/large-scale/stand-alone-grid-bordesholm-region.html

Join the event!

See all the content and easy-to-use features by logging in or registering!