Seismic Retrofitting in Record Time with Allplan Bridge

Seismic Retrofitting in Record Time with Allplan Bridge

Infrastructure Design
Seismic Retrofitting in Record Time with Allplan Bridge
Seismic Retrofitting in Record Time with Allplan Bridge
Seismic Retrofitting in Record Time with Allplan Bridge

Information

The Fanigliulo engineering firm used Allplan Bridge for seismic retrofitting of the Cernicchiara Viaduct, achieving a 50% reduction in design time with improved accuracy and integrated workflows, demonstrating the benefits of 3D design and parametric modeling in complex infrastructure projects.